System 160 soldier
The high-strength system for the most demanding formwork jobs. Higher load capacities throughout the system drastically reduce the number of components required, consequently reducing assembly and striking times. This can significantly increase the number of pours possible in a week and reduce overall job time to a minimum.
- A full range of accessories allows greater versatility in applications
- The 8 standard lengths available can closely match your requirements
- System 160 strength characteristics enable greater spacing of cantilevered members whilst keeping deflection to a minimum